
Inspection & Audit
Pre-production Inspection
The cheapest quality problems to fix are the ones caught before mass production. A pre-production inspection verifies that materials, components, tooling and samples meet the approved specification before the factory commits to a full run.
When it fits
When to schedule pre-production checks
Your order depends on materials or components that must meet a specification.
New tooling or moulds are being used for the first time.
A supplier change or specification change happened after sample approval.
You want documented assurance before authorising mass production.
Scope
Possible deliverables
- Pre-production checklist from your spec
- Material and component verification
- Tooling and setup review
- First-article or pilot sample check
- Readiness statement before production release
Process
Pre-production process
- 01
Checklist build
We turn your approved spec into a concrete pre-production checklist.
- 02
Material checks
Incoming materials and components are verified against the approved specification.
- 03
Setup review
Tooling, machine setup and process parameters are reviewed where relevant.
- 04
Pilot output
First articles or pilot samples are measured against tolerances and appearance standards.
- 05
Release decision
We report findings and recommend release, conditional release or correction before production starts.
Honest boundaries
Pre-production limits
- It checks readiness, not the full run — during-production and pre-shipment checks remain necessary for long production runs.
- Material verification depends on available certificates and sample evidence.
- We do not approve production on the supplier's behalf; we report findings for your decision.
Frequently asked questions
When should a pre-production inspection happen?
After sample approval and before the factory commits materials and machine time to the full run — typically one to two weeks before mass production starts.
What if materials fail the check?
The finding is escalated to you with options: substitution with approved materials, specification adjustment or supplier correction before release.
Is pre-production inspection compulsory?
It is optional but strongly recommended for new suppliers, new tooling or specification changes. It is the cheapest point to catch problems.
Explore
Related services
Ready when you are
Tell us what you need to source.
Share your product specifications, target market, estimated order volume and timeline. We will review the project and discuss a suitable approach.